The paper aims to analyze the “Unfinished” church of Brendola, designed by the engineer-archi- tect Fausto Franco. Economic problems led to the interruption of the church’s construction left the church in an unfinished situation, which is today recognized as a ruin. The research seeks to delineate a methodology of analysis for abandoned cultural heritage based on data digitization and multi-level stakeholders’ interaction to identify conservation strategies that the community could share.
La chiesa "Incompiuta" di Brendola. Processi collaborativi e memoria collettiva a confronto per una prospettiva di "longue durée" del bene culturale = The "Unfinished" church of Brendola. Collaborative processes and collective memory for a "longue durée" perspective on cultural heritage.
Emanuela Sorbo
;Gianluca Spironelli
2023-01-01
Abstract
The paper aims to analyze the “Unfinished” church of Brendola, designed by the engineer-archi- tect Fausto Franco. Economic problems led to the interruption of the church’s construction left the church in an unfinished situation, which is today recognized as a ruin. The research seeks to delineate a methodology of analysis for abandoned cultural heritage based on data digitization and multi-level stakeholders’ interaction to identify conservation strategies that the community could share.File in questo prodotto:
File | Dimensione | Formato | |
---|---|---|---|
Pagine da Proceedings_Torino2022_Estratto.pdf
accesso aperto
Descrizione: Estratto
Tipologia:
Versione Editoriale
Licenza:
Creative commons
Dimensione
470.16 kB
Formato
Adobe PDF
|
470.16 kB | Adobe PDF | Visualizza/Apri |
I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.